Internal control system deficiency and capital project mis-management in the Nigerian public sector
The aim of this study is to analyse the effects of internal control system deficiency on capital project management in the Nigerian public sector.A sample of two hundred and twenty eight capital projects (228) was used.Kendall’s tau_ b τ, ANOVA and Chi-square X2 statistics were employed for analysin...
Main Authors: | , |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
Elsevier Ltd.
2014
|
Subjects: | |
Online Access: | https://repo.uum.edu.my/id/eprint/13380/1/28.pdf |
_version_ | 1825803174779289600 |
---|---|
author | Babatunde, Shakirat Adepeju Dandago, Kabiru Isa |
author_facet | Babatunde, Shakirat Adepeju Dandago, Kabiru Isa |
author_sort | Babatunde, Shakirat Adepeju |
collection | UUM |
description | The aim of this study is to analyse the effects of internal control system deficiency on capital project management in the Nigerian public sector.A sample of two hundred and twenty eight capital projects (228) was used.Kendall’s tau_ b τ, ANOVA and Chi-square X2 statistics were employed for analysing the data collected. This study finds that internal control system deficiency has significant negative effects on capital project management in the Nigerian Public Sector.The study recommends strict compliance with internal control system in the best interest of
citizenry. |
first_indexed | 2024-07-04T05:52:32Z |
format | Conference or Workshop Item |
id | uum-13380 |
institution | Universiti Utara Malaysia |
language | English |
last_indexed | 2024-07-04T05:52:32Z |
publishDate | 2014 |
publisher | Elsevier Ltd. |
record_format | eprints |
spelling | uum-133802016-04-17T08:06:34Z https://repo.uum.edu.my/id/eprint/13380/ Internal control system deficiency and capital project mis-management in the Nigerian public sector Babatunde, Shakirat Adepeju Dandago, Kabiru Isa HF5601 Accounting The aim of this study is to analyse the effects of internal control system deficiency on capital project management in the Nigerian public sector.A sample of two hundred and twenty eight capital projects (228) was used.Kendall’s tau_ b τ, ANOVA and Chi-square X2 statistics were employed for analysing the data collected. This study finds that internal control system deficiency has significant negative effects on capital project management in the Nigerian Public Sector.The study recommends strict compliance with internal control system in the best interest of citizenry. Elsevier Ltd. 2014 Conference or Workshop Item PeerReviewed application/pdf en cc_by_nc_nd https://repo.uum.edu.my/id/eprint/13380/1/28.pdf Babatunde, Shakirat Adepeju and Dandago, Kabiru Isa (2014) Internal control system deficiency and capital project mis-management in the Nigerian public sector. In: International Conference on Accounting Studies (ICAS) 2014, 18 - 19 August 2014, Putra World Trade Centre, Kuala Lumpur. http://dx.doi.org/10.1016/j.sbspro.2014.11.069 doi:10.1016/j.sbspro.2014.11.069 doi:10.1016/j.sbspro.2014.11.069 |
spellingShingle | HF5601 Accounting Babatunde, Shakirat Adepeju Dandago, Kabiru Isa Internal control system deficiency and capital project mis-management in the Nigerian public sector |
title | Internal control system deficiency and capital project mis-management in the Nigerian public sector |
title_full | Internal control system deficiency and capital project mis-management in the Nigerian public sector |
title_fullStr | Internal control system deficiency and capital project mis-management in the Nigerian public sector |
title_full_unstemmed | Internal control system deficiency and capital project mis-management in the Nigerian public sector |
title_short | Internal control system deficiency and capital project mis-management in the Nigerian public sector |
title_sort | internal control system deficiency and capital project mis management in the nigerian public sector |
topic | HF5601 Accounting |
url | https://repo.uum.edu.my/id/eprint/13380/1/28.pdf |
work_keys_str_mv | AT babatundeshakiratadepeju internalcontrolsystemdeficiencyandcapitalprojectmismanagementinthenigerianpublicsector AT dandagokabiruisa internalcontrolsystemdeficiencyandcapitalprojectmismanagementinthenigerianpublicsector |