Internal control system deficiency and capital project mis-management in the Nigerian public sector

The aim of this study is to analyse the effects of internal control system deficiency on capital project management in the Nigerian public sector.A sample of two hundred and twenty eight capital projects (228) was used.Kendall’s tau_ b τ, ANOVA and Chi-square X2 statistics were employed for analysin...

Full description

Bibliographic Details
Main Authors: Babatunde, Shakirat Adepeju, Dandago, Kabiru Isa
Format: Conference or Workshop Item
Language:English
Published: Elsevier Ltd. 2014
Subjects:
Online Access:https://repo.uum.edu.my/id/eprint/13380/1/28.pdf
_version_ 1825803174779289600
author Babatunde, Shakirat Adepeju
Dandago, Kabiru Isa
author_facet Babatunde, Shakirat Adepeju
Dandago, Kabiru Isa
author_sort Babatunde, Shakirat Adepeju
collection UUM
description The aim of this study is to analyse the effects of internal control system deficiency on capital project management in the Nigerian public sector.A sample of two hundred and twenty eight capital projects (228) was used.Kendall’s tau_ b τ, ANOVA and Chi-square X2 statistics were employed for analysing the data collected. This study finds that internal control system deficiency has significant negative effects on capital project management in the Nigerian Public Sector.The study recommends strict compliance with internal control system in the best interest of citizenry.
first_indexed 2024-07-04T05:52:32Z
format Conference or Workshop Item
id uum-13380
institution Universiti Utara Malaysia
language English
last_indexed 2024-07-04T05:52:32Z
publishDate 2014
publisher Elsevier Ltd.
record_format eprints
spelling uum-133802016-04-17T08:06:34Z https://repo.uum.edu.my/id/eprint/13380/ Internal control system deficiency and capital project mis-management in the Nigerian public sector Babatunde, Shakirat Adepeju Dandago, Kabiru Isa HF5601 Accounting The aim of this study is to analyse the effects of internal control system deficiency on capital project management in the Nigerian public sector.A sample of two hundred and twenty eight capital projects (228) was used.Kendall’s tau_ b τ, ANOVA and Chi-square X2 statistics were employed for analysing the data collected. This study finds that internal control system deficiency has significant negative effects on capital project management in the Nigerian Public Sector.The study recommends strict compliance with internal control system in the best interest of citizenry. Elsevier Ltd. 2014 Conference or Workshop Item PeerReviewed application/pdf en cc_by_nc_nd https://repo.uum.edu.my/id/eprint/13380/1/28.pdf Babatunde, Shakirat Adepeju and Dandago, Kabiru Isa (2014) Internal control system deficiency and capital project mis-management in the Nigerian public sector. In: International Conference on Accounting Studies (ICAS) 2014, 18 - 19 August 2014, Putra World Trade Centre, Kuala Lumpur. http://dx.doi.org/10.1016/j.sbspro.2014.11.069 doi:10.1016/j.sbspro.2014.11.069 doi:10.1016/j.sbspro.2014.11.069
spellingShingle HF5601 Accounting
Babatunde, Shakirat Adepeju
Dandago, Kabiru Isa
Internal control system deficiency and capital project mis-management in the Nigerian public sector
title Internal control system deficiency and capital project mis-management in the Nigerian public sector
title_full Internal control system deficiency and capital project mis-management in the Nigerian public sector
title_fullStr Internal control system deficiency and capital project mis-management in the Nigerian public sector
title_full_unstemmed Internal control system deficiency and capital project mis-management in the Nigerian public sector
title_short Internal control system deficiency and capital project mis-management in the Nigerian public sector
title_sort internal control system deficiency and capital project mis management in the nigerian public sector
topic HF5601 Accounting
url https://repo.uum.edu.my/id/eprint/13380/1/28.pdf
work_keys_str_mv AT babatundeshakiratadepeju internalcontrolsystemdeficiencyandcapitalprojectmismanagementinthenigerianpublicsector
AT dandagokabiruisa internalcontrolsystemdeficiencyandcapitalprojectmismanagementinthenigerianpublicsector