Numerical Simulation of Construction Disturbances during Bidirectional Advancement of Undersea Large-Diameter Dual-Line Shield Tunneling

Relying on the Mawan undersea large-diameter, dual-line, mud–water-balanced shield tunnel project and focusing on the characteristics of the tunnel, such as the complex geological conditions at the expected intersection location and the existence of a superimposed perturbation or secondary perturbat...

Fuld beskrivelse

Bibliografiske detaljer
Main Authors: Tao Wang, Yu Xiang, Liyuan Liu, Wang Xiong
Format: Article
Sprog:English
Udgivet: MDPI AG 2024-03-01
Serier:Journal of Marine Science and Engineering
Fag:
Online adgang:https://www.mdpi.com/2077-1312/12/3/456