Stabilization of the arrival time of a relativistic electron beam to the 50 fs level

We report the results of a low-latency beam phase feed-forward system built to stabilise the arrival time of a relativistic electron beam. The system was operated at the Compact Linear Collider (CLIC) Test Facility (CTF3) at CERN where the beam arrival time was stabilised to approximately 50~fs. The...

সম্পূর্ণ বিবরণ

গ্রন্থ-পঞ্জীর বিবরন
প্রধান লেখক: Roberts, J, Skowronski, P, Burrows, P, Christian, G, Corsini, R, Ghigo, A, Marcellini, F, Perry, C
বিন্যাস: Journal article
প্রকাশিত: American Physical Society 2018

অনুরূপ উপাদানগুলি